Preview. Test data only. Do not upload a live insured’s files. Checkout is test mode — you will not be charged.

Cedar Creek Housing Authority

1,096 units · $146.3M TIV · 13 locations · Sample

PHA portfolio · KY218

Cedar Creek Housing Authority

Cedar Creek and Cedar County, KY. No conversion required. Cedar Creek shows PRH on a traditional public-housing book: one authority master, 11 developments, fleet, claims, COPE, broker stewardship and the next renewal.

Sample
  • 13 locations
  • 11 developments
  • 2 support sites
  • 30 properties
  • 9 coverage lines
  • 10 loss records
  • 1 city

Insured TIV

How calculated

How calculated

Sum of TIV on every location in this scope — dwellings and support sites. Matches the 2026 premium-year TIV. Program TIVs are the same dollars allocated by placement, not a second total. Board Report uses this same number.

$146.3M

13 locations · same number as Board Report

Locations

How calculated

How calculated

13 sites on the book: 11 developments plus 2 support sites.

13

11 developments + 2 support

In-force premium

How calculated

How calculated

Premium on lines with status bound, master, or project. Quoted and gap premiums are excluded.

$606,600

Bound / master / project only

Indicated premium

How calculated

How calculated

Premium recorded on quote or gap lines. It is not in-force and would not pay. Shown so the board can see the ask next to what is already bound.

Not recorded

Quote and gap lines — not in force

Today

  • MediumOn the book

    13 locations · $146.3M insured TIV

    11 developments + 2 support. In-force $606,600; indicated Not recorded.

  • RISK-CC-006MediumOn the book
    Master renewal 2026-11-13 · file completeness 92%

    12 of 13 required renewal tasks/exhibits are on the book.

  • SVC-004HighOverdue — broker action required
    Broker Stewardship (owner record) · 4 complete · 5 open · 1 overdue

    Bluegrass Public Entity Insurance (sample incumbent). 3 on time · 1 late · 5 owner attention · 0 blocked by owner. PRH reports the recorded process. The owner evaluates partner performance.

  • MediumOn the book
    How the book stays current · Broker Assisted (default)

    Bluegrass Public Entity Insurance is an invited contributor. Broker ~72% / owner ~18% / other partners ~6% / PRH reconciliation ~4% (illustrative; percentages vary). Broker participation makes PRH easier; it is never required. The broker can help maintain the book without owning the book.

What matters

  • RISK-BH-004HighNeeds confirmation
    Brookside Homes — Flood structure unresolved

    Flood structure unresolved for the master renewal: SFHA confirmation pending; NFIP indicated, not confirmed in force; excess none.

    4 recorded facts
    • SFHA confirmation pending — Brookside Homes — flood is not structured on the book until the zone is known.
    • NFIP indicated — not confirmed in force — Brookside Homes — indicated, not confirmed in force. Premium not recorded. No excess.
    • Excess flood none — Brookside Homes (AE (SFHA confirmation pending))
    • Renewal impact — Unresolved flood structure affects the next master renewal — SFHA confirmation, whether NFIP is in force, and that no excess is on the book.
  • RISK-CC-005MediumOn the book
    1 open claim

    $18,600 incurred still open on this book.

  • RISK-WC-007HighNeeds confirmation
    Mitigation not started — Willow Court

    plumbing / water · 0% · 3 losses on the book. Status and evidence live on portfolio data readiness.

  • RISK-CC-008HighOn the book
    Sprinkler status: Unsprinklered

    24 dwellings recorded as unsprinklered. The fact is on the schedule — it is a signal, not missing data.

What next

  • RISK-BH-004HighNeeds confirmation
    Brookside Homes — Flood structure unresolved

    Flood structure unresolved for the master renewal: SFHA confirmation pending; NFIP indicated, not confirmed in force; excess none.

    4 recorded facts
    • SFHA confirmation pending — Brookside Homes — flood is not structured on the book until the zone is known.
    • NFIP indicated — not confirmed in force — Brookside Homes — indicated, not confirmed in force. Premium not recorded. No excess.
    • Excess flood none — Brookside Homes (AE (SFHA confirmation pending))
    • Renewal impact — Unresolved flood structure affects the next master renewal — SFHA confirmation, whether NFIP is in force, and that no excess is on the book.
  • RISK-WC-007HighNeeds confirmation
    Mitigation not started — Willow Court

    plumbing / water · 0% · 3 losses on the book. Status and evidence live on portfolio data readiness.

  • SVC-004HighOverdue — broker action required
    Renewal strategy meeting

    Open items on the owner’s broker-relationship record: complete, overdue, or waiting on evidence — not a broker grade and not a placement by PRH.

  • SVC-003HighOwner verification pending
    SOV review with owner

    Open items on the owner’s broker-relationship record: complete, overdue, or waiting on evidence — not a broker grade and not a placement by PRH.

How the book stays current

Burden sits with the people who already have the information

Operating mode: Broker Assisted (default). Illustrative share of insurance records supplied — percentages vary.

  • Broker~72%
  • Owner~18%
  • Other partners~6%
  • PRH reconciliation~4%

    System admin / exception / normalization — not originating coverage or placement.

Broker participation makes PRH easier; it is never required.

The broker can help maintain the book without owning the book.

Risk Watchlist

Items the book already records — not a recommendation, and not a determination.

  • RISK-BH-004HighNeeds confirmation

    Brookside Homes — Flood structure unresolved

    Flood structure unresolved for the master renewal: SFHA confirmation pending; NFIP indicated, not confirmed in force; excess none.

    Flood exhibit — master renewal

    4 recorded facts
    • SFHA confirmation pending — Brookside Homes — flood is not structured on the book until the zone is known.
    • NFIP indicated — not confirmed in force — Brookside Homes — indicated, not confirmed in force. Premium not recorded. No excess.
    • Excess flood none — Brookside Homes (AE (SFHA confirmation pending))
    • Renewal impact — Unresolved flood structure affects the next master renewal — SFHA confirmation, whether NFIP is in force, and that no excess is on the book.
  • RISK-CC-005MediumOn the book

    1 open claim

    $18,600 incurred still open on this book.

    Loss run

  • RISK-WC-007HighNeeds confirmation

    Mitigation not started — Willow Court

    plumbing / water · 0% · 3 losses on the book. Status and evidence live on portfolio data readiness.

    Mitigation workroom

  • RISK-CC-008HighOn the book

    Sprinkler status: Unsprinklered

    24 dwellings recorded as unsprinklered. The fact is on the schedule — it is a signal, not missing data.

    SOV / building schedule

How the portfolio is split

Units and TIV on the traditional authority master — every AMP still ACC.

  • Public housing — not converted11 sites · 1096 units · $142.6M

Occupancy

Residential units by use.

  • Family8 developments · 852 units
  • Elderly / disabled2 developments · 188 units
  • Scattered sites1 development · 56 units

TIV by program

Every program on the portfolio.

  • Authority master$146.3M

Locations

Cedar CreekRiver corridorWillow CourtMaple RidgeBrookside HomesElm Street WalkRiverview TerraceHilltop GardensMeadow LaneOak Grove ElderlyPine HollowSouth CreekScattered SitesCentral OfficeMaintenance Yard
  • Public housing · 11
  • Support · 2

Flood concentration

Brookside is AE — SFHA confirmation pending. NFIP indicated, not confirmed in force. Premium not recorded. No excess.

Authority

Executive director
Marisol Vega
Employees / fleet
24 · 14 vehicles
Master renewal
2026-11-13
County
Cedar County, KY

Unconverted public housing

Still ACC, still on the authority master — no investor exhibit, no conversion closing. Replacement cost, flood and CAT still sit with the authority.

DevelopmentAMPUnitsTIVFloodStatus
Willow Court

WC · Cedar Creek · 1962

AMP-01168$21.4MXPublic housing
Maple Ridge

MR · Cedar Creek · 1968

AMP-02112$14.8MXPublic housing
Brookside Homes

BH · Cedar Creek · 1971

AMP-03140$18.6MAE (SFHA confirmation pending)Public housing
Elm Street Walk

EW · Cedar Creek · 1974

AMP-0488$11.2MXPublic housing
Riverview Terrace

RV · Cedar Creek · 1976

AMP-0596$13.8MXPublic housing
Hilltop Gardens

HG · Cedar Creek · 1979

AMP-06128$16.4MXPublic housing
Meadow Lane

ML · Cedar Creek · 1982

AMP-0780$9.8MXPublic housing
Oak Grove Elderly

OG · Cedar Creek · 1985

AMP-0892$12.9MXPublic housing
Pine Hollow

PH · Cedar Creek · 1991

AMP-0972$9.1MXPublic housing
South Creek

SC · Cedar Creek · 1994

AMP-1064$8.2MXPublic housing
Scattered Sites

SS · Cedar Creek · 1988

AMP-1156$6.4MXPublic housing

Losses

Claims on the traditional ACC book, plus the premium history that followed the exposure.

Public housing

$203,800

Incurred

$210,600

2021 premium

$486,000

2026 premium history

How calculated

How calculated

2026 premium history $606,600 = $606,600 in force. Indicated NFIP premium is not recorded.

$606,600

$606,600 in force

Traditional ACC public housing on one authority master. No RAD pipeline, no construction-to-permanent file, and no converted LP programs. The next event on the book is the master renewal.

Upload CSV or structured files to update matching fields. Policy PDFs may be stored; loading them into coverage lines in v1 is concierge or hand entry unless a later optional AI feature is on.

Ready to upload