Preview. Test data only. Do not upload a live insured’s files. Checkout is test mode — you will not be charged.

Portfolio Risk Hub

Cedar Creek Housing Authority · KY218

1,096 units · $146.3M TIV · 13 locations · Sample demo

BriefingDocuments
Portfolio Overview
BriefingWalkthroughDocumentsDevelopmentsSOVFleetLocationsCoverageCyberLossesStewardshipContributorsBroker
Renewal Command Center
Coverage Scenario Explorer
Reports & Deliverables

Sample demo — demonstration, not a live client.

Developments

SS · AMP-11

Scattered Sites

Scattered — Cedar Creek, Cedar Creek, KY 42721

Public housing

Traditional ACC · not converted

Units

56

Occupied

52 / 56

TIV

$6.4M

Properties

3

Property

Occupancy
Scattered sites
Construction
Frame / mixed
Year built
1988
Flood zone
X
CAT
Wind / hail
Named insured
Cedar Creek Housing Authority
Manager
CCHA (self-managed)

Insurance program

Program
CCHA Master Package
Type
Authority master
Carrier
Housing Authority Specialty / admitted package
Term
2025-11-20 → 2026-11-20
AOP deductible
$25,000 AOP
Wind-hail
2% of TIV
Named storm
Not applicable — inland location (documentary basis: no named-storm endorsement on the recorded master).
Flood
NFIP indicated for Brookside AE — not confirmed in force; no excess. Premium not recorded.
GL / umbrella
$1M / $2M · $10M

Deductibles — recorded precision

Basis, minimum, property vs program, and the policy reference. Source opens the document page and section. Not a coverage opinion.

DeductibleAmountBasisMinimumApplies toPolicy refSource
AOP$25,000Flat per occurrence — not a % of TIVFlat $25,000 (no percentage)CCHA Master Package — all ACC AMPs + supportCCHA Master Package · Form PRH-PROP-01Master property form · p. 12
Wind-hail2% of location TIVPercent of the damaged location’s TIV at time of loss$25,000 minimum per locationEach location on the master — not a portfolio-wide 2%CCHA Master Package · Form PRH-PROP-01 §Wind / hailMaster property form · p. 14
Named stormNot applicable — inland location (documentary basis: no named-storm endorsement on the recorded master).No named-storm endorsement on the recorded masterNot recordedCCHA Master PackageCCHA Master Package · Form PRH-PROP-01 §Named stormMaster property form · p. 15

Source documents on this property

Uploaded and sample files attached to this development or a building. Open the document — not a coverage opinion.

No file is attached here yet. Open the Document Library to upload or classify one.

Document Library

Buildings and parcels

3 properties on this AMP — COPE on each line.

Full schedule
PropertyConstructionOccupancyProtectionExposureTIV

Scattered cluster 1

Scattered — Cedar Creek

Frame (ISO 1)

18,620 sf · 1988 · 1 sty

Architectural shingle · Roof replaced 2018

Scattered sites

Scattered dwellings · 19 units

None

Smoke Yes · Central No

PPC 4

Zone X

Residential

$2.1M

Bldg $1.8M

Contents $128K

LoR $171K

Scattered cluster 2

Scattered — Cedar Creek

Frame (ISO 1)

18,620 sf · 1989 · 1 sty

Architectural shingle · Roof replaced 2019

Scattered sites

Scattered dwellings · 19 units

None

Smoke Yes · Central No

PPC 4

Zone X

Residential

$2.1M

Bldg $1.8M

Contents $128K

LoR $171K

Scattered cluster 3

Scattered — Cedar Creek

Frame (ISO 1)

17,640 sf · 1990 · 1 sty

Architectural shingle · Roof replaced 2020

Scattered sites

Scattered dwellings · 18 units

None

Smoke Yes · Central No

PPC 4

Zone X

Residential

$2.1M

Bldg $1.8M

Contents $128K

LoR $171K

Coverage on this program

  • Property — buildings

    Replacement-cost statements on 1962–1974 AMPs last refreshed in 2025.

    $146.3M blanket TIV

    $25K AOP · 2% wind / hail

    $428,000 · $.29 / $100 TIV

  • General liability

    Habitational form. No separate project CGL — there are no converted LPs.

    $1M / $2M

    $0

    $38,000 · $35 / unit

  • Umbrella / excess

    Single umbrella over the master package.

    $10M

    Follows primary

    $41,000 · 0.41% of limit

  • Automobile

    Maintenance and administration units. No third-party management fleet.

    $1M CSL · 14 units

    $1,000 comp / collision

    $32,000 · $2,286 / vehicle

  • Workers compensation

    Maintenance, administration, and site staff on one policy.

    Statutory

    None

    $46,000 · $3.71 / $100 payroll

  • Crime / fidelity

    Employee theft and premises. HUD-typical fidelity limit.

    $500,000

    $5,000

    $4,200 · $4,200

  • Public officials / D&O

    Authority-only. No LP directors.

    $2M

    $10,000

    $9,800 · $9,800

  • Cyber liability

    Quiet file. No incident in the sample years. Cyber sits on the authority program. Tenant, HCV, and PIC data run through authority systems.

    $1M

    $25,000

    $7,600 · $7,600

  • NFIP

    NFIP indicated for Brookside AE. Not confirmed in force. Premium not recorded. No excess flood.

    NFIP building maximum — Brookside AE

    NFIP form

Conversion observation

Scattered single-family and duplexes. Self-managed. Same master program.

Not subject to an investor exhibit or permanent-lender closing package. Conditions that matter here are replacement cost, flood determinations, CAT deductibles on the master, and ordinance or law on a total loss.

Cedar CreekRiver corridorWillow CourtMaple RidgeBrookside HomesElm Street WalkRiverview TerraceHilltop GardensMeadow LaneOak Grove ElderlyPine HollowSouth CreekScattered SitesCentral OfficeMaintenance Yard
  • Public housing · 11
  • Support · 2