Property
- Occupancy
- Family
- Construction
- Masonry / joisted masonry
- Year built
- 1962
- Flood zone
- X
- CAT
- Wind / hail
- Named insured
- Cedar Creek Housing Authority
- Manager
- CCHA (self-managed)
Preview. Test data only. Do not upload a live insured’s files. Checkout is test mode — you will not be charged.
Cedar Creek Housing Authority · KY218
1,096 units · $146.3M TIV · 13 locations · Sample
WC · AMP-01
100 Willow Court, Cedar Creek, KY 42721
Traditional ACC · not converted
Units
168
Occupied
161 / 168
TIV
$21.4M
Properties
4
4 properties on this AMP — COPE on each line.
| Property | Construction | Occupancy | Protection | Exposure | TIV |
|---|---|---|---|---|---|
Building A 100 Willow Court Roof year lags the rest of the AMP. | Joisted masonry (ISO 2) 34,440 sf · 1962 · 2 sty Architectural shingle · Roof replaced 1980 | Family Garden-style family · 42 units | None Smoke Yes · Central No PPC 4 | Zone X Residential | $5.3M Bldg $4.6M Contents $321K LoR $428K |
Building B 100 Willow Court | Joisted masonry (ISO 2) 34,440 sf · 1963 · 2 sty Architectural shingle · Roof replaced 1982 | Family Garden-style family · 42 units | None Smoke Yes · Central No PPC 4 | Zone X Residential | $5.3M Bldg $4.6M Contents $321K LoR $428K |
Building C 100 Willow Court | Joisted masonry (ISO 2) 34,440 sf · 1964 · 2 sty Architectural shingle · Roof replaced 1984 | Family Garden-style family · 42 units | None Smoke Yes · Central No PPC 4 | Zone X Residential | $5.3M Bldg $4.6M Contents $321K LoR $428K |
Building D 100 Willow Court | Joisted masonry (ISO 2) 34,440 sf · 1965 · 2 sty Architectural shingle · Roof replaced 1986 | Family Garden-style family · 42 units | None Smoke Yes · Central No PPC 4 | Zone X Residential | $5.3M Bldg $4.6M Contents $321K LoR $428K |
Property — buildings
Replacement-cost statements on 1962–1974 AMPs last refreshed in 2025.
$146.3M blanket TIV
$25K AOP · 2% wind / hail
$428,000 · $.29 / $100 TIV
General liability
Habitational form. No separate project CGL — there are no converted LPs.
$1M / $2M
$0
$38,000 · $35 / unit
Umbrella / excess
Single umbrella over the master package.
$10M
Follows primary
$41,000 · 0.41% of limit
Automobile
Maintenance and administration units. No third-party management fleet.
$1M CSL · 14 units
$1,000 comp / collision
$32,000 · $2,286 / vehicle
Workers compensation
Maintenance, administration, and site staff on one policy.
Statutory
None
$46,000 · $3.71 / $100 payroll
Crime / fidelity
Employee theft and premises. HUD-typical fidelity limit.
$500,000
$5,000
$4,200 · $4,200
Public officials / D&O
Authority-only. No LP directors.
$2M
$10,000
$9,800 · $9,800
Cyber liability
Quiet file. No incident in the sample years.
$1M
$25,000
$7,600 · $7,600
NFIP
NFIP indicated for Brookside AE. Not confirmed in force. Premium not recorded. No excess flood.
NFIP building maximum — Brookside AE
NFIP form
Oldest family AMP. On the authority master. Roof ages vary by building.
Not subject to an investor exhibit or permanent-lender closing package. Conditions that matter here are replacement cost, flood determinations, CAT deductibles on the master, and ordinance or law on a total loss.
Upload
Upload CSV or structured files to update matching fields. Policy PDFs may be stored; loading them into coverage lines in v1 is concierge or hand entry unless a later optional AI feature is on.
Ready to upload