Preview. Test data only. Do not upload a live insured’s files. Checkout is test mode — you will not be charged.

Portfolio Risk Hub

Northbank Housing Partners

396 units · $91.9M TIV · 6 locations · Sample demo

BriefingDocuments
Portfolio Overview
BriefingWalkthroughDocumentsDevelopmentsSOVLocationsCoverageLossesStewardshipContributorsBroker
Conversion Hub
Renewal Command Center
Coverage Scenario Explorer
Reports & Deliverables

Sample demo — demonstration, not a live client.

Combined insurance program

Every program on the portfolio

Placed 4% and 9% LPs sit on their own project programs. Millwork Lofts is between them — builder’s risk bound, permanent quoted. There is no authority master and no auto line.

Portfolio rates

Composite

How calculatedⓘ

How calculated

Sum of TIV on every location in this scope — dwellings and support sites. Matches the 2026 premium-year TIV. Program TIVs are the same dollars allocated by placement, not a second total. Board Report uses this same number.

$.40 / $100

$91.9M TIV

In-force premium

How calculatedⓘ

How calculated

Premium on lines with status bound, master, or project. Quoted and gap premiums are excluded.

$369,000

Bound / master / project only

Indicated premium

How calculatedⓘ

How calculated

Premium recorded on quote or gap lines. It is not in-force and would not pay. Shown so the board can see the ask next to what is already bound.

$98,000

Quote and gap — not in force

Property

$.38 / $100

$351,000 property, flood, BR, IM

Casualty

$18,000

GL, umbrella, auto, WC, crime, D&O, cyber

Per unit

$932

396 units across the portfolio

Rate by program

All-lines rate is in-force premium over that program’s TIV. Property rate uses only property, flood, builder’s risk and inland marine.

ProgramTIVPremiumAll-linesPropertyShare

Millwork Lofts builder’s risk

Construction

$28.4M$160,000$.56 / $100$.50 / $100
43%

Ash Court LP project

Project — 4% LP

$18.1M$54,000$.30 / $100$.30 / $100
15%

Elm Senior LP project

Project — 9% senior

$16.6M$48,000$.29 / $100$.29 / $100
13%

River Park Family project

Project — mixed-finance

$14.2M$61,000$.43 / $100$.43 / $100
17%

Cottonwood Housing LP project

Project — Year 15

$9.8M$32,000$.33 / $100$.33 / $100
9%

NHP Scattered Sites LLC

Project — CDC scattered

$4.8M$14,000$.29 / $100$.29 / $100
4%
Portfolio$91.9M$369,000$.40 / $100$.38 / $100100%

TIV across the portfolio

$91.9M insured value · 8 lines · 6 programs

  • Millwork Lofts builder’s risk$28.4M · 31%
  • Ash Court LP project$18.1M · 20%
  • Elm Senior LP project$16.6M · 18%
  • River Park Family project$14.2M · 15%
  • Cottonwood Housing LP project$9.8M · 11%
  • NHP Scattered Sites LLC$4.8M · 5%

TIV, occurrence, and sublimits

Three different recorded numbers. Do not treat schedule TIV as an occurrence limit or a sublimit.

Insured TIV

$91.9M

Sum of location TIV on the schedule. A value — not an occurrence limit and not a sublimit.

Occurrence limits

Builder’s risk: $28.4M TIV · General liability — construction partnership: $1M / $2M · Property — Ash Court LP: $18.1M TIV · Property — Elm Senior LP: $16.6M TIV

Per-occurrence (or equivalent) limits on in-force lines. Distinct from schedule TIV.

Sublimits

None recorded on this book

Narrower limits inside a line (per-claim / aggregate). Not the blanket TIV and not the AOP deductible.

Deductibles — recorded precision

Basis, minimum, property vs program, and the policy reference. Source opens the document page and section. Not a coverage opinion.

DeductibleAmountBasisMinimumApplies toPolicy refSource
AOP$10K AOPAs recorded on the program — not inferred as a % of TIV$10Millwork Lofts builder’s riskMillwork Lofts builder’s riskRecorded program
Wind-hail5% named stormPercent of TIV as recordedMinimum not recordedMillwork Lofts builder’s riskMillwork Lofts builder’s riskRecorded program
Named storm5%Percent of TIV as recordedMinimum not recordedMillwork Lofts builder’s riskMillwork Lofts builder’s riskRecorded program

Construction

Millwork Lofts builder’s risk

Admitted builder’s risk

TIV
$28.4M
In-force premium
$160,000
All-lines rate
$.56 / $100
Property rate
$.50 / $100
AOP / named storm
$10K AOP5%
Flood
Sub-limited

Bound through conversion. Occupancy permission still open.

LinePremiumRate
Builder’s risk$142,000$.50 / $100 TIV
Property — permanent (quoted)quote$98,000$.35 / $100 TIV
General liability — construction partnership$18,000$188 / unit
  • ML Millwork Lofts

Project — 4% LP

Ash Court LP project

Admitted package

TIV
$18.1M
In-force premium
$54,000
All-lines rate
$.30 / $100
Property rate
$.30 / $100
AOP / named storm
$10K AOP2%
Flood
Zone X — none

Named insured Ash Court LP. GP additional insured.

LinePremiumRate
Property — Ash Court LP$54,000$.30 / $100 TIV
  • AC Ash Court

Project — 9% senior

Elm Senior LP project

Admitted package

TIV
$16.6M
In-force premium
$48,000
All-lines rate
$.29 / $100
Property rate
$.29 / $100
AOP / named storm
$10K AOP2%
Flood
Zone X — none

PBRA senior. Investor LP/SP already endorsed.

LinePremiumRate
Property — Elm Senior LP$48,000$.29 / $100 TIV
  • ES Elm Street Senior

Project — mixed-finance

River Park Family project

Admitted package + excess flood

TIV
$14.2M
In-force premium
$61,000
All-lines rate
$.43 / $100
Property rate
$.43 / $100
AOP / named storm
$10K AOP2%
Flood
NFIP + excess

Zone AE. Excess flood in force.

LinePremiumRate
Property — River Park Family LLC$61,000$.43 / $100 TIV
  • RP River Park Family

Project — Year 15

Cottonwood Housing LP project

Admitted package

TIV
$9.8M
In-force premium
$32,000
All-lines rate
$.33 / $100
Property rate
$.33 / $100
AOP / named storm
$25K AOP2%
Flood
Zone X — none

Values lag. Year 15 recap will re-trade the program.

LinePremiumRate
Property — Cottonwood Housing LP$32,000$.33 / $100 TIV
  • CW Cottonwood Apartments

Project — CDC scattered

NHP Scattered Sites LLC

Admitted package

TIV
$4.8M
In-force premium
$14,000
All-lines rate
$.29 / $100
Property rate
$.29 / $100
AOP
$5K AOP
Wind-hail
$5K wind / hail
Named storm
Not applicable — inland location (documentary basis: no named-storm endorsement on the recorded master).
Flood
Zone X — none

Blanket on 12 duplexes.

LinePremiumRate
Property — NHP Scattered Sites LLC$14,000$.29 / $100 TIV
  • PD Pine Street Duplexes

Combined coverage schedule

Quoted and gap lines show an indicated rate and are not in the in-force premium.

LineApplies toLimitRetentionCarrierPremiumRateStatus

Builder’s risk

Soft costs in. Occupancy permission outstanding.

Millwork Lofts LP — construction$28.4M TIV$10K AOP · 5% named stormAdmitted builder’s risk$142,000$.50 / $100 TIVbound

Property — permanent (quoted)

Quoted. Not in the in-force composite.

Millwork Lofts LP — conversion$28.4M TIV$10K AOP · 2% named stormAdmitted package (quote)$98,000Indicated
$.35 / $100 TIV
quote

General liability — construction partnership

Investor AI still certificate-only.

Millwork Lofts LP + GP$1M / $2M$0Admitted CGL$18,000$188 / unitbound

Property — Ash Court LP

Ash Court LP$18.1M TIV$10K AOP · 2% named stormAdmitted package$54,000$.30 / $100 TIVproject

Property — Elm Senior LP

Elm Senior LP$16.6M TIV$10K AOP · 2% named stormAdmitted package$48,000$.29 / $100 TIVproject

Property — River Park Family LLC

Zone AE. Excess flood in force.

River Park Family LLC$14.2M TIV + excess flood$10K AOP · NFIP + excessAdmitted package + excess flood$61,000$.43 / $100 TIVproject

Property — Cottonwood Housing LP

Year 15 values lag replacement cost.

Cottonwood Housing LP$9.8M TIV$25K AOP · 2% named stormAdmitted package$32,000$.33 / $100 TIVproject

Property — NHP Scattered Sites LLC

Blanket duplexes.

NHP Scattered Sites LLC$4.8M TIV$5K AOPAdmitted package$14,000$.29 / $100 TIVproject

In-force $369,000 · 7 of 8 lines bound. Millwork permanent is quoted at $.35 / $100 TIV and is not in the composite.

Master vs project

Each LP is the named insured on its project property. The construction partnership carries builder’s risk until conversion. Permanent for Millwork is quoted and is not in the in-force composite.

Composite is $.40 / $100

In-force premium is $369K on $91.9M TIV. In-force premium is placed-project property plus Millwork builder’s risk. The quoted permanent is excluded until it binds.

There is no PHA master on this book. Casualty that belongs to a partnership stays with that partnership. The sponsor CDC does not run an auto program. See Conversion Hub for Millwork Lofts. Open Coverage Scenario Explorer.