Millwork Lofts

96 units · $28.4M TIV · Permanent conversion 10/20

Conversion Hub · conversion record

Millwork Lofts conversion

Keep every insurance requirement, evidence item, variance and coverage transition tied to the conversion record. The conversion record for this 9% LIHTC construction-to-perm file — requirements register, parties, evidence ledger, variance record, coverage handoff and Conversion Briefing. Review date Sep 5, 2026 · Closing in 40 days.

Sample

Requirements tracked

8

Potential variances

4

Awaiting written confirmation

3

Workflow

  1. 1

    Capture

    Done

  2. 2

    Reconcile

    Done

  3. 3

    Resolve

    Current

  4. 4

    Transition

Evidence consistent

1

Pending confirmation

3

Potential variance

4

Not yet evaluated

0

IssueSourceCurrent observationStatus

Replacement cost / TIV

Permanent lenderBuilder’s risk TIV $28.4M matches the SOV; permanent RC statement is draftPending confirmation

Mortgagee / loss payee wording

Construction lenderConstruction lender is loss payee. Permanent mortgagee clause is not on the binderPending confirmation

Flood determination

RISK-ML-004
Permanent lenderZone X on the site plan. Lender still wants a life-of-loan determinationPending confirmation

Capital parties

  • Permanent lender

    First Carolina Community Bank

  • Construction lender

    Carolina Construction Bank

  • Investor

    Piedmont Tax Credit Fund XII

  • Sponsor / GP

    Northbank Housing Partners, Inc.

  • Contractor

    Southline Builders LLC

Conversion snapshot

Evidence still open
1
Exception files
2

Next dates

Schedule
  • Flood determination in handSep 21, 26
  • GP / SLP on builder’s riskSep 23, 26
  • Occupancy permissionSep 26, 26
  • Bind permanent / cancel builder’s riskOct 7, 26

Owner-side workstream · on this conversion

Every register on this conversion

Millwork Lofts is the active sample conversion. Open any register to see the same record the owner, lender and investor would work from.

Requirements Register

8 requirements · named insured stack, occupancy, and 5% vs 2% named storm still open

Party & Insured-Interest Register

8 parties · Millwork Lofts LP as borrower · GP and SLP pending on builder’s risk

Evidence Ledger

4 documents · ACORD 25 needs an endorsement · builder’s risk bound, permanent quoted

Variance Record

2 files · construction NS 5% vs permanent 2% · investor AI certificate-only

Coverage Handoff Timeline

Builder’s risk bound at $28.4M · permanent quoted, not bound · occupancy still open

Program diagnostic

Property / CAT, liability and construction — the same record that feeds the Conversion Briefing

Continuing Requirements Schedule

4 open dates · flood determination and conversion bind

Conversion Briefing

The record for capital parties: what is consistent, what is a variance, and what you are being asked to decide

Upload CSV or structured files to update matching fields. Policy PDFs may be stored; loading them into coverage lines in v1 is concierge or hand entry unless a later optional AI feature is on.

Ready to upload