Millwork Lofts · 9% LIHTC · construction-to-permanent
96 units · $28.4M TIV · Permanent conversion 10/20
Conversion Hub · conversion record
Keep every insurance requirement, evidence item, variance and coverage transition tied to the conversion record. The conversion record for this 9% LIHTC construction-to-perm file — requirements register, parties, evidence ledger, variance record, coverage handoff and Conversion Briefing. Review date Sep 5, 2026 · Closing in 40 days.
Requirements tracked
8
Potential variances
4
Awaiting written confirmation
3
Workflow
1
Capture
Done
2
Reconcile
Done
3
Resolve
Current
4
Transition
Evidence consistent
1
Pending confirmation
3
Potential variance
4
Not yet evaluated
0
| Issue | Source | Current observation | Status |
|---|---|---|---|
Replacement cost / TIV | Permanent lender | Builder’s risk TIV $28.4M matches the SOV; permanent RC statement is draft | Pending confirmation |
Mortgagee / loss payee wording | Construction lender | Construction lender is loss payee. Permanent mortgagee clause is not on the binder | Pending confirmation |
Flood determination RISK-ML-004 | Permanent lender | Zone X on the site plan. Lender still wants a life-of-loan determination | Pending confirmation |
Permanent lender
First Carolina Community Bank
Construction lender
Carolina Construction Bank
Investor
Piedmont Tax Credit Fund XII
Sponsor / GP
Northbank Housing Partners, Inc.
Contractor
Southline Builders LLC
Owner-side workstream · on this conversion
Millwork Lofts is the active sample conversion. Open any register to see the same record the owner, lender and investor would work from.
8 requirements · named insured stack, occupancy, and 5% vs 2% named storm still open
8 parties · Millwork Lofts LP as borrower · GP and SLP pending on builder’s risk
4 documents · ACORD 25 needs an endorsement · builder’s risk bound, permanent quoted
2 files · construction NS 5% vs permanent 2% · investor AI certificate-only
Builder’s risk bound at $28.4M · permanent quoted, not bound · occupancy still open
Property / CAT, liability and construction — the same record that feeds the Conversion Briefing
4 open dates · flood determination and conversion bind
The record for capital parties: what is consistent, what is a variance, and what you are being asked to decide
Upload
Upload CSV or structured files to update matching fields. Policy PDFs may be stored; loading them into coverage lines in v1 is concierge or hand entry unless a later optional AI feature is on.
Ready to upload