Northbank Housing Partners

396 units · $91.9M TIV · 6 locations · Sample

Loss history · NHP

Losses

Five-plus years of claims by partnership and by the active sample closing. Premium follows the same cut — what is on a placed LP, what is on construction, and what the market charged for the exposure that remained.

Claims (2021–26)

4

Incurred

$273,000

Open reserve

$25,000

2026 premium history

How calculated

How calculated

2026 premium history $369,000 = $369,000 in force + $0 indicated NFIP. This is not a second in-force total.

$369,000

Period loss ratio

35%

Losses by conversion

Site claims grouped by partnership. Placed LPs produce the attritional water and wind. Millwork’s builder’s risk carries the live construction theft.

Conversion incurred $273,000 across 4 claims · 6 developments

Losses by development

Same claims, cut by development. Use the chips below to open one site at a time.

4 of 4 claims in view.

DateLocationCauseLinePortfolioIncurredStatus
Feb 11, 24Ash Court

Water — supply line

Supply-line water in a garden building. Project property responded. LP named insured.

propertyPlaced LIHTC / operating$84,000closed
Jan 22, 25Elm Street Senior

Freeze

Freeze at an unheated stair. Senior PBRA. No authority casualty line.

propertyPlaced LIHTC / operating$41,000

$3,000 reserved

open
Aug 4, 23River Park Family

Wind / hail

Convective wind on the river corridor. Excess flood not triggered.

propertyPlaced LIHTC / operating$126,000closed
Mar 18, 26Millwork Lofts

Theft — construction materials

Jobsite theft on builder’s risk. Construction partnership, not a PHA master.

builders riskIn conversion$22,000

$22,000 reserved

open

Premium against the exposure

Units jump when Millwork’s 96 units enter TIV on builder’s risk. Occupied does not — the site is vacant. Fleet is zero.

YearUnits / occ.TIVMaster / project / BRStaffProperty · casualtyPremiumRateIncurred · LR
2024300 / 291$63.5M$0 · $63.5M · 16$168,000
$30,000
$198,000$.31 / $100$84,00042%
2025300 / 291$63.5M$0 · $63.5M · 17$176,000
$33,000
$209,000

+0%

$.33 / $100$41,00020%
2026396 / 291$91.9M$0 · $63.5M · $28.4M18$351,000
$18,000
$369,000

+1%

$.40 / $100$22,0006%
  • 2024

    Placed LPs only. No construction. No auto.

  • 2025

    CAT rate on River Park flood. Still no fleet.

  • 2026

    Millwork builder’s risk in force. Permanent not in the composite. Occupied units do not include the vacant construction site.

Conversion moves premium. It does not erase it.

2026 premium rises because construction TIV arrived, not because a master program was rewritten. Quoted permanent is still outside the composite.

Unconverted ACC is the attritional engine

Ash Court water, Elm freeze, River Park wind. Cottonwood and the duplexes are quiet in the sample years.

Authority casualty does not convert

No auto, WC, crime or EPL on this book. Those lines were never part of the developer program.