Property
- Occupancy
- Family
- Construction
- Combustible / wood frame, new construction
- Year built
- 2026
- Flood zone
- X
- CAT
- Wind / hail · convective
- Named insured
- Millwork Lofts LP
- Manager
- Northbank Management LLC
Preview. Test data only. Do not upload a live insured’s files. Checkout is test mode — you will not be charged.
Northbank Housing Partners
396 units · $91.9M TIV · 6 locations · Sample demo
ML
410 East Pettigrew Street, Durham, NC 27701
9% LIHTC · construction-to-perm in process
Units
96
Occupied
0 / 96
TIV
$28.4M
Properties
2
Basis, minimum, property vs program, and the policy reference. Source opens the document page and section. Not a coverage opinion.
| Deductible | Amount | Basis | Minimum | Applies to | Policy ref | Source |
|---|---|---|---|---|---|---|
| AOP | $10K AOP | As recorded on the program — not inferred as a % of TIV | $10 | Millwork Lofts builder’s risk | Millwork Lofts builder’s risk | Recorded program |
| Wind-hail | 5% named storm | Percent of TIV as recorded | Minimum not recorded | Millwork Lofts builder’s risk | Millwork Lofts builder’s risk | Recorded program |
| Named storm | 5% | Percent of TIV as recorded | Minimum not recorded | Millwork Lofts builder’s risk | Millwork Lofts builder’s risk | Recorded program |
Uploaded and sample files attached to this development or a building. Open the document — not a coverage opinion.
No file is attached here yet. Open the Document Library to upload or classify one.
2 properties on this development — COPE on each line.
| Property | Construction | Occupancy | Protection | Exposure | TIV |
|---|---|---|---|---|---|
Building A 410 East Pettigrew Street Builder’s risk. Permanent not bound. | Frame (ISO 1) 42,800 sf · 2026 · 3 sty Architectural shingle · Roof replaced 2026 | Family Garden-style family — new construction · 48 units | Wet pipe (NFPA 13R) Smoke Yes · Central Yes PPC 3 | Zone X Former mill / residential | $14.2M Bldg $12.5M Contents $860K LoR $860K |
Building B 410 East Pettigrew Street Builder’s risk. Permanent not bound. | Frame (ISO 1) 42,800 sf · 2026 · 3 sty Architectural shingle · Roof replaced 2026 | Family Garden-style family — new construction · 48 units | Wet pipe (NFPA 13R) Smoke Yes · Central Yes PPC 3 | Zone X Former mill / residential | $14.2M Bldg $12.5M Contents $860K LoR $860K |
Builder’s risk
Soft costs in. Occupancy permission outstanding.
$28.4M TIV
$10K AOP · 5% named storm
$142,000 · $.50 / $100 TIV
Property — permanent (quoted)
Quoted. Not in the in-force composite.
$28.4M TIV
$10K AOP · 2% named storm
$98,000 · $.35 / $100 TIV
General liability — construction partnership
Investor AI still certificate-only.
$1M / $2M
$0
$18,000 · $188 / unit
Active sample conversion on Conversion Hub. Builder’s risk bound. Permanent quoted, not bound. Investor and both lenders are on the Requirements Register.