Preview. Test data only. Do not upload a live insured’s files. Checkout is test mode — you will not be charged.

Reports & Deliverables

Board packets and owner-side exports from this workspace

Reports & Deliverables · Board Report

What the board needs this cycle

Coverage posture & open items, and change since last renewal — compiled from this hub’s book. Choose the whole portfolio or one development, then Detailed or Quick update.

Sample

Version

Workspace summary compiled from this firm’s book. It is not a legal opinion and not a recommendation to bind, retain, or close. Licensed advisors and the policy control.

Northbank Housing Partners

Durham, NC · Master renewal October 3, 2026

Entire portfolio: $91.9M TIV, 396 units, in-force premium $369,000 (+1% same-store rate).

Detailed · Entire portfolio

Insured TIV

How calculated

How calculated

Sum of TIV on every location in this scope — dwellings and support sites. Matches the 2026 premium-year TIV. Program TIVs are the same dollars allocated by placement, not a second total. Board Report uses this same number.

$91.9M

Entire portfolio

Locations

How calculated

How calculated

6 sites on the book.

6

6 developments

In-force premium

How calculated

How calculated

Premium on lines with status bound, master, or project. Quoted and gap premiums are excluded.

$369,000

Indicated premium

How calculated

How calculated

Premium recorded on quote or gap lines. It is not in-force and would not pay. Shown so the board can see the ask next to what is already bound.

$98,000

Quote and gap — not in force

Changes since last renewal

20252026 · +1% rate · TIV +$28.4M · premium +$160,000

Millwork builder’s risk in force. Permanent not in the composite. Occupied units do not include the vacant construction site.

CAT rate on River Park flood. Still no fleet.

Coverage posture & open items

Where the book records a line, where limits or deductibles sit against exposure, and which gaps are already flagged. Not a legal opinion. Licensed advisors and the policy control.

  • Watch

    No cyber line on this scope

    This slice of the book does not include a Cyber and Privacy Liability record. Check the authority master.

  • Watch

    Property — permanent (quoted) · quote only

    Millwork Lofts LP — conversion. $28.4M TIV. Quoted. Not in the in-force composite.

  • RISK-RP-004Gap on the book

    River Park Family: flood vs AE exposure

    River Park Family sits in AE. The book does not show a structured flood placement for this site.

  • RISK-ML-002Watch

    Millwork Lofts builder’s risk: deductibles vs TIV

    Property AOP $10K AOP wind 5% named storm named storm 5% on $28.4M program TIV. A 5% named-storm deductible is a large retained amount relative to a single AMP TIV — the board should know that number before a CAT event.

  • Note

    Ash Court LP project: deductibles vs TIV

    Property AOP $10K AOP wind 2% named storm named storm 2% on $18.1M program TIV.

  • Note

    Elm Senior LP project: deductibles vs TIV

    Property AOP $10K AOP wind 2% named storm named storm 2% on $16.6M program TIV.

  • Note

    River Park Family project: deductibles vs TIV

    Property AOP $10K AOP wind 2% named storm named storm 2% on $14.2M program TIV.

  • Note

    Cottonwood Housing LP project: deductibles vs TIV

    Property AOP $25K AOP wind 2% named storm named storm 2% on $9.8M program TIV.

  • Note

    NHP Scattered Sites LLC: deductibles vs TIV

    Property AOP $5K AOP wind $5K wind / hail named storm N/A inland on $4.8M program TIV.

Coverage

LineLimitDeductible / retentionStatus

Builder’s risk

Millwork Lofts builder’s risk

$28.4M TIV$10K AOP · 5% named stormbound

Property — permanent (quoted)

Millwork Lofts builder’s risk

$28.4M TIV$10K AOP · 2% named stormquote

General liability — construction partnership

Millwork Lofts builder’s risk

$1M / $2M$0bound

Property — Ash Court LP

Ash Court LP project

$18.1M TIV$10K AOP · 2% named stormproject

Property — Elm Senior LP

Elm Senior LP project

$16.6M TIV$10K AOP · 2% named stormproject

Property — River Park Family LLC

River Park Family project

$14.2M TIV + excess flood$10K AOP · NFIP + excessproject

Property — Cottonwood Housing LP

Cottonwood Housing LP project

$9.8M TIV$25K AOP · 2% named stormproject

Property — NHP Scattered Sites LLC

NHP Scattered Sites LLC

$4.8M TIV$5K AOPproject

Conversion posture

  • Millwork LoftsIn conversion · 96 units · $28.4M
  • Ash CourtPlaced LIHTC / operating · 72 units · $18.1M
  • Elm Street SeniorPlaced LIHTC / operating · 80 units · $16.6M
  • River Park FamilyPlaced LIHTC / operating · 64 units · $14.2M
  • Cottonwood ApartmentsYear 15 · 60 units · $9.8M
  • Pine Street DuplexesPlaced LIHTC / operating · 24 units · $4.8M

Losses

4 claims on this scope · $273,000 incurred · 2 open

  • March 18, 2026 · Millwork Lofts · $22,000

    Theft — construction materials — Jobsite theft on builder’s risk. Construction partnership, not a PHA master.

  • January 22, 2025 · Elm Street Senior · $41,000

    Freeze — Freeze at an unheated stair. Senior PBRA. No authority casualty line.

  • February 11, 2024 · Ash Court · $84,000

    Water — supply line — Supply-line water in a garden building. Project property responded. LP named insured.

  • August 4, 2023 · River Park Family · $126,000

    Wind / hail — Convective wind on the river corridor. Excess flood not triggered.

Upload CSV or structured files to update matching fields. Policy PDFs may be stored; loading them into coverage lines in v1 is concierge or hand entry unless a later optional AI feature is on.

Ready to upload