Values
17/17
No missing-data deductions on this pillar.
Preview. Test data only. Do not upload a live insured’s files. Checkout is test mode — you will not be charged.
Renewal Command Center
Organize the file for licensed advisors — not market advice
Underwriting readiness
Portfolio data readiness is only whether necessary information is present, current, and validated (Values, COPE, Loss, Flood, Entity, Coverage). Risk & underwriting signals — unsprinklered construction, open claims, incomplete mitigation — stay visible without lowering that score. File organization for licensed advisors, not a rating or a bind recommendation.
2 data gaps · Sprinkler status: 16 unsprinklered · Underwriting signal: Elevated
Portfolio data readiness How calculated Six pillars (Values 17, COPE 17, Loss information 17, Flood 16, Entity accuracy 16, Coverage schedule 17). Deductions are missing or unvalidated facts only. Recorded adverse facts — unsprinklered dwellings, open claims, indicated lines — are signals, not deductions. This is not renewal file completeness.How calculated
86/100
Values / COPE / Loss / Flood / Entity / Coverage
Risk & underwriting signals
6 open
Accurate adverse facts already on the book
Mitigation loops
11
Repeat-loss patterns derived from this loss run
Risk & underwriting signals
Oakridge Court — Flood structure unresolved
One flood-structure issue: determination, indicated NFIP, whether excess flood is structured, and closing evidence.
Conversion Hub flood exhibit
Permanent property (quoted) is indicated, not in force
$312,000 is on the quote line. It is not in the in-force composite.
Coverage schedule
$200,800 incurred still open on this book.
Loss run
Mitigation in progress — Pinecrest Homes
plumbing / water · 55% · 3 losses on the book. Status and evidence live on portfolio data readiness.
Mitigation workroom
Sprinkler status: Unsprinklered
16 dwellings recorded as unsprinklered. The fact is on the schedule — it is a signal, not missing data.
SOV / building schedule
Large CAT / named-storm deductible on the program
CBHA Master Package: named storm 5% of TIV; wind 2% of TIV · Oakridge Court Conversion Program: named storm 5% current / 2% requested; wind 2% quoted
Program schedule
Mitigation tracking
Patterns come from two or more losses at the same development with the same cause. Progress, cost, and evidence slots are a workroom record for licensed advisors and the property underwriter — not advice to install anything.
Supply-line replacement and leak detection at Pinecrest Homes — recorded from the repeat water losses.
3 losses · $57,400 incurred · progress 55%
Evidence upload slots
Hold for next renewal compare — water-loss count vs prior term once the file is submitted.
Recorded mitigation for the repeat freeze pattern at Cedar Lane Apartments.
2 losses · $227,600 incurred · progress 0%
Evidence upload slots
Recorded mitigation for the repeat vandalism pattern at Scattered Sites.
2 losses · $31,000 incurred · progress 0%
Evidence upload slots
Supply-line replacement and leak detection at Westover Courts — recorded from the repeat water losses.
3 losses · $147,900 incurred · progress 0%
Evidence upload slots
Recorded mitigation for the repeat slip and fall pattern at Magnolia Senior.
2 losses · $42,600 incurred · progress 0%
Evidence upload slots
Supply-line replacement and leak detection at Southside Walk — recorded from the repeat water losses.
3 losses · $64,300 incurred · progress 0%
Evidence upload slots
Recorded mitigation for the repeat wind / hail pattern at Southside Walk.
2 losses · $60,000 incurred · progress 0%
Evidence upload slots
Supply-line replacement and leak detection at Riverbend Family — recorded from the repeat water losses.
2 losses · $40,800 incurred · progress 0%
Evidence upload slots
Supply-line replacement and leak detection at Eastview Terrace — recorded from the repeat water losses.
3 losses · $55,400 incurred · progress 0%
Evidence upload slots
Recorded mitigation for the repeat strain pattern at Maintenance staff.
3 losses · $71,600 incurred · progress 0%
Evidence upload slots
Recorded mitigation for the repeat intersection collision pattern at Authority fleet.
2 losses · $61,000 incurred · progress 0%
Evidence upload slots
17/17
No missing-data deductions on this pillar.
17/17
No missing-data deductions on this pillar.
17/17
No missing-data deductions on this pillar.
8/16
10/16
17/17
No missing-data deductions on this pillar.
Upload
Upload CSV or structured files to update matching fields. Policy PDFs may be stored; loading them into coverage lines in v1 is concierge or hand entry unless a later optional AI feature is on.
Ready to upload