Crescent Bend Housing Authority

962 units · $186.4M TIV · 12 locations

Statement of values

Edit the property schedule

Upload, add, change or remove buildings for the whole portfolio or one conversion at a time. Each property carries COPE — construction, occupancy, protection and exposure. Auto stays on its own register.

You can edit the sample. Sign in to keep changes and write the history log.

COPE

Construction

$62.0M

Frame $62.0M · JM $64.4M · ISO 3–6 $60.0M

Occupancy

$144.3M

Family $144.3M · elderly $22.3M · scattered $13.9M

TIV mix

$186.4M

Building $163.2M · contents $12.2M · loss of rents $11.0M

Protection

$59.5M

Unsprinklered TIV · 8 buildings PPC 5+

Exposure

$49.9M

Zone AE TIV · convective wind / hail on the inland portfolio

42 properties · 962 units · $186.4M

TIV by conversion

Click a conversion above to edit just that slice of the SOV.

  • Public housing$66.3M
  • RAD pipeline$11.4M
  • In conversion$42.6M
  • Converted$60.2M
  • Authority support$5.9M

Historical view

How count and tiv moved year by year — conversions, write-downs and replacements — before your live edits.

  • 202138 · $148.2M · 962 units

    Quiet ACC portfolio. Eastview and Oakridge still on the master. Riverbend already a project program.

  • 202238 · $157.4M · 962 units

    Eastview RAD close. Three buildings revalued after rehab — TIV up, count unchanged. Values leave the master for the project program.

  • 202340 · $164.8M · 962 units · +2/−0

    Two scattered AE parcels scheduled that had sat in the blanket. TIV inflation on unconverted stock.

  • 202436 · $152.6M · 962 units · +0/−6

    Oakridge residents relocated. Six former ACC buildings written down and removed ahead of demolition. Occupied units drop 180.

  • 202540 · $171.2M · 962 units · +4/−0

    Four Oakridge pads added on builder's risk as construction starts. Master SOV is now unconverted ACC plus support.

  • 202642 · $186.4M · 962 units · +2/−0

    Current portfolio. Oakridge fully on builder's risk. Two support-line corrections (annex, inland marine) added to the SOV.

Change log

Adds, updates, removals and uploads — seeded history plus anything you change.

  1. Feb 3, 2026

    Added

    Yard / inland marine

    Contractors equipment scheduled separately from the shop.

  2. Feb 3, 2026

    Added

    Board / records annex

    Annex split out of the administration building line.

  3. Jun 20, 2025

    Added

    Oakridge Building 4 + clubhouse

    Fourth pad and clubhouse added to the conversion SOV.

  4. Apr 2, 2025

    Added

    Oakridge Building 3

    Pad added as framing started.

  5. Jan 8, 2025

    Added

    Oakridge Building 2

    Pad added on builder's risk.

  6. Jan 8, 2025

    Added

    Oakridge Building 1

    Pad added on builder's risk. Permanent program not bound.

  7. Jun 11, 2024

    Removed

    Oakridge Court (former ACC)

    Six vacant ACC buildings written down and removed ahead of demolition. 180 units relocated.

  8. Mar 12, 2023

    Added

    Industrial Avenue house

    Second AE parcel scheduled. Flood evidence still incomplete.

  9. Mar 12, 2023

    Added

    Valley Road duplex

    AE parcel pulled out of the scattered blanket and scheduled separately.

  10. Jul 18, 2022

    Updated

    Eastview Terrace

    RAD close. Buildings A–C revalued after rehab, $19.2M → $28.4M. Moved off the master onto the project program.

  11. Jul 1, 2021

    Upload

    CBHA master SOV

    Annual SOV refresh on the master. 38 properties, $148.2M.