Crescent Bend Housing Authority

962 units · $186.4M TIV · 12 locations · Example portfolio

Developments

SC · AMP-10

Scattered Sites

Various — Meridian metro, Meridian, MS 39301

Public housing

Traditional ACC scattered · not converted

Units

86

Occupied

79 / 86

TIV

$13.9M

Properties

10

Property

Occupancy
Scattered sites
Construction
Mixed wood frame and masonry
Year built
1970
Flood zone
Mixed X / AE
CAT
Wind / hail · isolated flood
Named insured
Crescent Bend Housing Authority
Manager
CBHA (self-managed)

Insurance program

Program
CBHA Master Package
Type
Authority master
Carrier
Housing Authority Specialty / admitted package
Term
2025-07-01 → 2026-07-01
AOP deductible
$25,000 AOP
Named storm
5% of TIV
Flood
NFIP on AE parcels; no excess
GL / umbrella
$1M / $2M · $10M

Buildings and parcels

10 properties on this AMP — COPE on each line.

Full schedule
PropertyConstructionOccupancyProtectionExposureTIV

14th Street duplex

1814 14th Street

Frame (ISO 1)

1,800 sf · 1968 · 1 sty

Asphalt shingle · Roof replaced 2010

Scattered sites

Duplex · 2 units

None

Smoke No · Central No

PPC 4

Zone X

Residential street

$320K

Bldg $288K

Contents $16K

LoR $16K

22nd Avenue house

409 22nd Avenue

Frame (ISO 1)

1,100 sf · 1971 · 1 sty

Asphalt shingle · Roof replaced 2010

Scattered sites

Single-family · 1 units

None

Smoke No · Central No

PPC 4

Zone X

Residential street

$160K

Bldg $144K

Contents $8K

LoR $8K

Poplar Court fourplex

22 Poplar Court

Frame (ISO 1)

3,600 sf · 1974 · 2 sty

Asphalt shingle · Roof replaced 2010

Scattered sites

Fourplex · 4 units

None

Smoke No · Central No

PPC 4

Zone X

Residential court

$640K

Bldg $576K

Contents $32K

LoR $32K

8th Street row

700 block 8th Street

Joisted masonry (ISO 2)

7,200 sf · 1969 · 2 sty

Asphalt shingle · Roof replaced 2012

Scattered sites

Row / townhouse cluster · 8 units

None

Smoke Yes · Central No

PPC 4

Zone X

Mixed residential

$1.3M

Bldg $1.2M

Contents $64K

LoR $64K

Valley Road duplex

118 Valley Road

AE parcel. NFIP evidence incomplete.

Frame (ISO 1)

1,900 sf · 1972 · 1 sty

Asphalt shingle · Roof replaced 2010

Scattered sites

Duplex — AE · 2 units

None

Smoke No · Central No

PPC 4

Zone AE

Drainage / low-lying residential

$340K

Bldg $306K

Contents $17K

LoR $17K

Industrial Avenue house

44 Industrial Avenue

AE parcel. Determination outstanding.

Frame (ISO 1)

1,050 sf · 1966 · 1 sty

Asphalt shingle · Roof replaced 2010

Scattered sites

Single-family — AE · 1 units

None

Smoke No · Central No

PPC 5

Zone AE

Light industrial / floodplain

$180K

Bldg $162K

Contents $9K

LoR $9K

5th Street cluster

5th Street cluster

Six duplexes on one AMP line.

Frame (ISO 1)

10,800 sf · 1970 · 1 sty

Asphalt shingle · Roof replaced 2010

Scattered sites

Six duplexes, one AMP line · 12 units

None

Smoke No · Central No

PPC 4

Zone X

Residential cluster

$1.9M

Bldg $1.7M

Contents $96K

LoR $96K

18th Avenue cluster

18th Avenue cluster

Frame (ISO 1)

14,400 sf · 1973 · 1 sty

Asphalt shingle · Roof replaced 2010

Scattered sites

Scattered cluster · 16 units

None

Smoke No · Central No

PPC 4

Zone X

Residential

$2.6M

Bldg $2.3M

Contents $128K

LoR $128K

Marion Road duplex

210 Marion Road

Marion city-edge parcel.

Frame (ISO 1)

1,800 sf · 1975 · 1 sty

Asphalt shingle · Roof replaced 2010

Scattered sites

Duplex — Marion edge · 2 units

None

Smoke No · Central No

PPC 6

Zone X

Rural residential / highway

$300K

Bldg $270K

Contents $15K

LoR $15K

Remainder blanket

Various — Meridian metro

Blanket on the master. Parcel-level flood still open on several addresses.

Frame (ISO 1)

34,200 sf · 1970 · 1 sty

Mixed shingle / BUR · Roof replaced 2008

Scattered sites

Blanket remainder — mixed frame and masonry · 38 units

None

Smoke No · Central No

PPC 4

Zone Mixed X / AE

Mixed X / AE parcels across the metro

$6.2M

Bldg $5.6M

Contents $310K

LoR $310K

Coverage on this program

  • Property — buildings

    Replacement-cost statements on 1958–1984 AMPs have not been re-appraised since 2023.

    $83.6M blanket TIV

    $25K AOP · 5% named storm

    $612,000 · $.73 / $100 TIV

  • General liability

    Habitational form. Converted LPs carry their own CGL.

    $1M / $2M

    $0

    $54,000 · $106 / unit

  • Umbrella / excess

    Lower than converted project umbrellas ($15M / $25M).

    $10M

    Follows primary

    $72,000 · 0.72% of limit

  • Automobile

    Converted entities do not schedule vehicles here.

    $1M CSL · 42 units

    $1,000 comp / collision

    $88,000 · $2,095 / vehicle

  • Workers compensation

    47 CBHA employees

    Statutory

    None

    $94,000 · $4.20 / $100 payroll

  • Crime / fidelity

    Investor crime on Oakridge is a separate quote.

    $1M

    $10,000

    $9,500 · 0.95% of limit

  • Public officials / D&O

    Does not extend to LP general partners on converted deals.

    $2M

    $25,000

    $22,000 · 1.10% of limit

  • Cyber

    HCV / PIC and tenant PII sit here. Converted sites use the same network.

    $1M

    $25,000

    $16,000 · 1.60% of limit

  • Flood — NFIP

    No excess flood on the master. Riverbend carries excess on its own program. Scattered-site parcel determinations are incomplete.

    Building max per AE building

    NFIP statutory

    $32,000 · $.28 / $100 TIV

  • Inland marine / contractors equipment

    Maintenance Yard

    $1.8M scheduled

    $5,000

    $12,500 · $.69 / $100 TIV

Desk observation

Single-family and duplex ACC units across the metro. Blanket property on the master. Several parcels sit in AE; flood evidence is incomplete at the parcel level.

Not subject to an investor exhibit or permanent-lender closing package. Conditions that matter here are replacement cost, flood determinations, CAT deductibles on the master, and ordinance or law on a total loss.

MeridianMarionRiver corridorOakridge CourtOCEastview TerraceEVRiverbend FamilyRBPinecrest HomesPCCedar Lane ApartmentsCLWestover CourtsWCHighland ParkHPSouthside WalkSWMagnolia SeniorMGScattered SitesSCCentral OfficeCOMaintenance YardYD
  • Public housing
  • RAD pipeline
  • In conversion
  • Converted
  • Support