Preview. Test data only. Do not upload a live insured’s files. Checkout is test mode — you will not be charged.

Portfolio Risk Hub

Crescent Bend Housing Authority · MS194

962 units · $186.4M TIV · 12 locations · Sample demo

BriefingDocuments
Portfolio Overview
BriefingWalkthroughDocumentsDevelopmentsSOVFleetLocationsCoverageCyberLossesStewardshipContributorsBroker
Conversion Hub
Renewal Command Center
Coverage Scenario Explorer
Reports & Deliverables

Sample demo — demonstration, not a live client.

View access as

Crescent scoped-access demo

Two brokers on different lines, plus a lender on the Oakridge conversion. Preview only — this does not change the owner-controlled book. Only the owner Applies a verified fact.

Owner Admin — full book

Owner Admin. Verifies and Applies. Sees every line and the Oakridge conversion.

Placewell — Contributor

Contributor scoped to Property — buildings (c01). Access is not ownership.

Ridgeway — Contributor

Contributor scoped to Automobile (c04). Access is not ownership.

First National — Viewer

Viewer on the Oakridge Court conversion file. Read-only — not ownership of the book.

Scoped access

Full book

Your access is the full owner-controlled book. PRH does not place coverage or act as your broker. Only the owner Applies a verified fact to the book.

Statement of values

Edit the property schedule

Upload, add, change or remove buildings for the whole portfolio or one conversion at a time. Each property carries COPE — construction, occupancy, protection and exposure. Auto stays on its own register.

You can edit the sample. Sign in to keep changes and write the history log.

COPE

Construction

$62.0M

Frame $62.0M · JM $64.4M · ISO 3–6 $60.0M

Occupancy

$144.3M

Family $144.3M · elderly $22.3M · scattered $13.9M

TIV mix

$186.4M

Building $163.2M · contents $12.2M · loss of rents $11.0M

Protection

$59.5M

Unsprinklered TIV · 8 buildings PPC 5+

Exposure

$49.9M

Zone AE TIV · convective wind / hail on the inland portfolio

42 properties · 962 units · $186.4M

TIV by conversion

Click a conversion above to edit just that slice of the SOV.

  • Public housing$66.3M
  • RAD pipeline$11.4M
  • In conversion$42.6M
  • Converted$60.2M
  • Authority support$5.9M

Historical view

How count and tiv moved year by year — conversions, write-downs and replacements — before your live edits.

  • 202138 · $148.2M · 962 units

    Quiet ACC portfolio. Eastview and Oakridge still on the master. Riverbend already a project program.

  • 202238 · $157.4M · 962 units

    Eastview RAD close. Three buildings revalued after rehab — TIV up, count unchanged. Values leave the master for the project program.

  • 202340 · $164.8M · 962 units · +2/−0

    Two scattered AE parcels scheduled that had sat in the blanket. TIV inflation on unconverted stock.

  • 202436 · $152.6M · 962 units · +0/−6

    Oakridge residents relocated. Six former ACC buildings written down and removed ahead of demolition. Occupied units drop 180.

  • 202540 · $171.2M · 962 units · +4/−0

    Four Oakridge pads added on builder's risk as construction starts. Master SOV is now unconverted ACC plus support.

  • 202642 · $186.4M · 962 units · +2/−0

    Current portfolio. Oakridge fully on builder's risk. Two support-line corrections (annex, inland marine) added to the SOV.

Change log

Adds, updates, removals and uploads — seeded history plus anything you change.

  1. Feb 3, 2026

    Added

    Yard / inland marine

    Contractors equipment scheduled separately from the shop.

  2. Feb 3, 2026

    Added

    Board / records annex

    Annex split out of the administration building line.

  3. Jun 20, 2025

    Added

    Oakridge Building 4 + clubhouse

    Fourth pad and clubhouse added to the conversion SOV.

  4. Apr 2, 2025

    Added

    Oakridge Building 3

    Pad added as framing started.

  5. Jan 8, 2025

    Added

    Oakridge Building 2

    Pad added on builder's risk.

  6. Jan 8, 2025

    Added

    Oakridge Building 1

    Pad added on builder's risk. Permanent program not bound.

  7. Jun 11, 2024

    Removed

    Oakridge Court (former ACC)

    Six vacant ACC buildings written down and removed ahead of demolition. 180 units relocated.

  8. Mar 12, 2023

    Added

    Industrial Avenue house

    Second AE parcel scheduled. Flood evidence still incomplete.

  9. Mar 12, 2023

    Added

    Valley Road duplex

    AE parcel pulled out of the scattered blanket and scheduled separately.

  10. Jul 18, 2022

    Updated

    Eastview Terrace

    RAD close. Buildings A–C revalued after rehab, $19.2M → $28.4M. Moved off the master onto the project program.

  11. Jul 1, 2021

    Upload

    CBHA master SOV

    Annual SOV refresh on the master. 38 properties, $148.2M.