Oakridge Court — Flood structure unresolved
One flood-structure issue: determination, indicated NFIP, whether excess flood is structured, and closing evidence.
- Owner
- Owner
- Deadline
- Master renewal Dec 10, 2026
- Sources
- Conversion Hub flood exhibit
Recorded
- NFIP indicated $32,000. Southside Walk + scattered AE parcels
- Excess flood not structured. Southside Walk (AE) · Scattered Sites (Mixed X / AE)
Still needs action
- SFHA pending. Oakridge Court — flood is not structured on the book until the zone is known.
- Conversion impact. SFHA determination pending. Order determination, NFIP evidence and excess flood option
Next action. Confirm SFHA, whether NFIP is in force, and record the premium — then apply to the owner master.